Our Performance Solution reports are produced following the completion of your Wall System design. They are fundamental to the process of ensuring your design meets the minimum Performance Requirements of NCC 2019 – Vol 1 and follow the structure of a Performance-based Design Brief.
The steps below will allow you to undertaken Performance Solution when you build a Wall System to the requirements of J1.5 – Total System R-value for walls (AS/NZS 4859.2:2018) requirements, including thermal bridging (NZS 4214:2006).
Step 1 – Let’s first reuse the Lightweight Cladding (Cavity fixed to 92mm steel frame) Wall System we created in Wall Systems Tutorial 1 – Getting Started.
Step 2 – Reviewing a Performance Solution could not be easier. Once you have built a Wall System, results are displayed under Performance Solution on the right-hand side. Simply click and download.
Step 3 – Next up… find your Performance Solution in your local folder. Here you can see our default Performance Solution structure, based on the Performance-based Design Brief.
Step 4 - When your happy, simply rename your Performance Solution, store it in a suitable location or share it with others.